For the key control systems of signaling and train control, traction and power feeding, integrated monitoring, etc., AETHER rail transit industrial control safety platform restores the application scenarios and the whole life cycle, builds holographic modeling for safety baseline, so as to provide technical criteria for the testing and qualification of industrial control products before market access, and provide service support for operation and maintenance sectors for remote fault diagnosis and maintenance.
Operational scenario excitation and acquisition, wave recording test auto playback, response data dual mapping
Build control function command library, command signal template extracting, build excitation and response template library
Excitation signal recognition and positioning, dual signal search and tracking, response signal recognition
Item | Parameter |
System bandwidth (per direction) | Up to 24 GB/s |
Analog input maximum sampling rate | 2 MS/s/ch |
Analog output maximum refresh rate | 3.3 MS/s |
Time accuracy | 50 ppm/time |
Analog input channels | 16-channel AI (16-bit, 2 MS/s/ch); input range ±10V-±1 V |
Analog output channels | 4-channel AO (16-bit, 3.33 MS/s); output ±10 V |
DIO channels | 48-channel DIO (5 V TTL line); 32 hardware timers, max. 10 MHz |
公司目前于成都市双流区在建占地面积约75亩的工业园区,建成后将作为公司技术研发中心、城市轨道交通系统安全保障技术国家工程实验室成都基地,在科研、生产、产业推广等领域发挥关键作用。
实用新型及外观设计专利
发明专利
软件著作权